Filter Results +

Select State

Select Age Range

Select Length

Select Position Type

Part-Time
Full-Time
Entry-Level
Temporary
Contractual
Permanent
Paid
Unpaid

Select Field

Agriculture
Air Quality
Climate
Communications/Marketing
Conservation
Design
Education
Energy
Engineering
Fisheries/Aquaculture
Forestry
Horticulture
General
Landscaping
Outreach/Community Engagement
Recreation
Restoration
Water
Wildlife
  • JoeRieger
    added a new Job in
    Pollution Source Detection & Elimination
    Posted August 5, 2020

    Restoration Administrative Coordinator- Elizabeth River Project

    Restoration Administrative Coordinator ELIZABETH RIVER PROJECT www.elizabethriver.org Summary The Elizabeth River Project, one of the oldest and largest environmental nonprofits on the Chesapeake Bay, seeks a Restoration Administrative Coordinator to assist with all aspects of administering programs to restore water quality and wildlife habitat in the Elizabeth River watershed, with an emphasis on grant and…

    Read more

  • JoeRieger
    added a new Job in
    Pollution Source Detection & Elimination
    Posted July 15, 2020

    Assistant Director, Restoration- Elizabeth River Project

    Assistant Director, Restoration ELIZABETH RIVER PROJECT www.elizabethriver.org July 13, 2020 Summary The Elizabeth River Project, one of the oldest and largest environmental nonprofits on the Chesapeake Bay, seeks a full-time Assistant Director, Restoration to assist the Deputy Director-Restoration with planning and implementing river restoration projects, with a special emphasis on planning and constructing “living shorelines.”…

    Read more

  • Renee Bourassa
    added a new Job in
    Pollution Source Detection & Elimination
    Posted December 17, 2018

    Request for Proposal (RFP): Pilot Study of Water Quality Data Collected under MS4 Phase 1 Permits

    The Interstate Commission on the Potomac River Basin would like to announce a Request for Proposal (RFP) for a Pilot Study of Water Quality Data Collected under Maryland’s Municipal Separate Storm Sewer System Phase 1 Permits. The submission deadline is December 31, 2018. Learn more here: https://www.potomacriver.org/news/rfp-pilot-study-ms4/

    Read more