REQUEST FOR PROPOSALS (RFP)
Stormwater Retention Construction – Engineering + Design Services
Permeable Paver Project – 6810 Eastern Avenue NW, Washington, DC
1.1 Purpose
ecospaces L.L.C. is soliciting proposals from integrated teams (engineering + design) OR firms that demonstrate clear collaboration between disciplines. Single-discipline proposals are discouraged unless partnered.
1.2 Mandatory Team Structure
Proposals MUST include:
– Licensed Professional Engineer (PE)
– Designer (Landscape Architect / Stormwater Designer)
Teams may be:
– In-house multidisciplinary, OR
– Joint venture / subcontracted partnership
Failure to include BOTH disciplines may result in disqualification.
1.3 Project Objective
- Engage a civil engineer to complete the design calculations required to quantify the Stormwater Retention Credits (SRCs) this project will generate, outlining the scope of work and associated costs for preparing SRC-related calculations and all relevant documentation needed for DOEE submission and certification.
- Maximize net SRC yield per dollar invested.
Proposals must explicitly address:
– SRC optimization strategy
– Cost vs. performance tradeoffs
– Design scenarios that increase retention volume
1.4 Required Design & Analysis Approach
Teams must provide:
- Baseline Scenario
– Standard permeable paver design
– SRC estimate
- Optimized Scenario(s)
– Increased storage depth
– Expanded drainage capture
– Alternative configurations
– SRC yield increase quantified
1.5 Cost Efficiency Metric
– $ per SRC (REQUIRED)
– Total projected SRCs
– Payback assumptions
1.6 Scoring Criteria (100 Points Total)
Proposals will be evaluated as follows:
- Technical Approach (25 pts)
– Strength of modeling methodology
– Understanding of DOEE + SRC program
- Design Innovation & SRC Optimization (25 pts)
– Ability to increase SRC yield
– Creativity in system design
- Cost Effectiveness (20 pts)
– Total cost vs SRC output
– Clarity of pricing breakdown
- Team Structure & Experience (20 pts)
– Demonstrated collaboration between disciplines
– Relevant DC project experience
- Schedule (10 pts)
– Ability to meet grant deadlines
1.7 Required Cost Breakdown
Proposals MUST itemize:
– Survey (if applicable)
– Concept Design
– Stormwater Modeling / SRC Calculations
– Design Development
– Permitting Support (DOEE, DOB, DDOT)
– DOEE Submission
Optional:
– Construction Documents
– Construction Administration
– As-Built Certification
Reference Benchmarks (for context only):
– Survey: ~$5,000
– Stormwater Design: ~$15,000
– DOB Permit: ~$2,000
– DDOT Permit: ~$1,200
1.8 Deliverable Standardization
To ensure comparable bids, proposals MUST include:
– SRC summary table:
* Baseline SRCs
* Optimized SRCs
* % increase
– Cost per SRC calculation
– Clear assumptions list
– Modeling approach identified
1.9 Submission Requirements
Include:
– Experience and Qualifications
– Technical Approach
– Design Strategy
– Project Team (Engineer + Designer)
– Schedule
– Cost Proposal (detailed)
– References (3 minimum)
2.0 Bid Selection Process
ecospaces will select based on BEST VALUE, not lowest cost.
Priority will be given to teams that:
– Maximize SRC yield
– Clearly quantify performance
– Provide transparent pricing
2.1 Submission Deadlines
May 31, 2026
2.2 Submit To
Austin Coard
austin@ecospacesdc.com
2.3 Additional Terms
ecospaces reserves the right to reject any proposal.
All proposal costs are borne by the proposer.
The selected team will enter into a contract.